Commercial
Start a similar project
Office Building Exterior Paint Refresh
Project overview
Two elevations of a 1980s office block were faded and chalking. We washed down the facade, primed bare concrete and applied a two-tone exterior system within a dry-weather window.
Key work
- Full facade wash and moss removal
- Concrete primer on bare patches
- Two-tone exterior coating system
- Tenant notice and access plan
The block was handed over on schedule with no interruption to tenant parking.
Project gallery
Related works
More transformations from the studio
Contact
Got a project
in mind?
Tell us what needs painting and we will confirm a survey slot within one business day.
Book a schedule